Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636925

- Product Categories
- Friendly Links
- home > Supply > SMT equipment relocation Dongguan Which is best? _ _ Zhongshan SMT Xinming Logistics
Information Name: | SMT equipment relocation Dongguan Which is best? _ _ Zhongshan SMT Xinming Logistics |
Published: | 2015-03-23 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Guangzhou Ming-Hitachi brand for customer equipment for drilling machine shift loading operations, length of drill equipment is about 6 meters wide and is about 1.8 meters, weighs six tons, the weight of two big points and 9 ton! The job can be said that there is no difficulty, because the characteristics of the job environment, equipment, do not have much difficulty, there is we have a wealth of experience in similar operations, but every one of our staff is very careful and cautious in job, then our duty, but also to customer satisfaction service! First, we still use mechanical jack device from the top, and then slip into the shoes group, and then push the human equipment, using a slide shoe group key is to be placed in an appropriate location, and then head to control the car, move to the door When to use 10 tons forklift truck mounted crane equipment fork to SMT equipment relocation Dongguan Which is best? Because the weight of the device can be crossed 10 t truck, you can not use truck mounted crane to crane, saving time. There is a transport distance is about 300 meters SMT, so use Crane to be significant savings in transportation costs ~! Punch is also a relatively sophisticated electronic equipment, in order to protect the equipment, we are have to put wood in the slip pad shoe above groups and forklift fork, so the device can play a protective role and improve job security! In wind power construction of the building, the construction of major projects focus and effort is reflected in the fan installation work, under normal circumstances, crawler cranes with a lifting device to act as the protagonist, cranes then play a supporting role in Huizhou SMT equipment relocation Which is best? The main task is to complete the installation of the nacelle, tower and impeller three major components. In recent years, the state with new energy-based wind power demonstration project to make special arrangements, such as the size of the domestic wind power developed rapidly mushrooming. Currently there are more than the installed capacity of 100MW and above wind farms have been built or under construction in Jiangsu, Jilin, Liaoning, Guangdong, Inner Mongolia, Xinjiang, Ningxia and other places. Below is a brief description of wind farms to be fan installation process: a blower fan equipment equipment consisting mainly by the base, tower, nacelle, hub, blades, box-type transformers, and electrical and other components. By weight of various models of different devices, different heights of the tower, while the height of the tower is generally determined by the height of the wind force distribution. 2 Installation Site Requirements domestic wind farm construction and equipment storage space, there are two main types of SMT equipment positioning Which is best? One is set up at the site for temporary storage space, centrally located in the temporary storage device after the arrival of the fan, the installation and then transported to the secondary lifting points. Another is to directly transport to the ceiling fan equipment stored on site is no longer a secondary transport. In order to save transportation costs, a growing number of wind farms using a wind turbine equipment in place ways. But this also increased the requirements for the installation site, each installation site must be able to store all the equipment sets a fan, and allow a large crane and auxiliary cranes lifting equipment location. It is therefore necessary to carry out site plan before the equipment arrived at the scene, so that the fan installation site meets the requirements. SMT equipment relocation Dongguan Which is best? _ _ Zhongshan Xinming Logistics SMT provided by Shenzhen Xinming Logistics Limited (Shenzhen Branch Ming-Group). Shenzhen Xinming Logistics Limited (Ming Tong Group, Shenzhen Branch) (www.sz-mdmt.com) is an industry leader in Shenzhen, Guangdong, logistics equipment, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness , and satisfy customer needs. In Xinming Logistics leadership with the staff warmly welcome all inquiries negotiations to create Xinming Logistics a better future. |
Admin>>>
You are the 21983 visitor
Copyright © GuangDong ICP No. 10089450, Shenzhen Xinming Logistics Limited (Shenzhen Branch Ming-Group) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21983 visitor
Copyright © GuangDong ICP No. 10089450, Shenzhen Xinming Logistics Limited (Shenzhen Branch Ming-Group) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility